Country:The Republic of Burundi
Utility:REGIDESO
Projects Background:
The Regideso launches an international tender notice of a market by restricted consultation of the pre-qualified manufacturers for the supply and delivery of operating equipment, maintenance and extension of MT/BT networks of Bujumbura and centers in the interior of the country.
The characteristics of the material desired by the regideso are defined in the specific technical clauses notebook, as well as in the quantities and prices slip in the appendix.
This market concerns the supply of operating equipment, maintenance and extension of Bujumbura MT/BT networks and interior centers.
Products Lists:
1.Conducteur nu AL-Ac ; 35/6 mm² ;
2.Sectionneur tripolaire 30kv à coupure en charge avec commande manuel et accessoires de fixation sur poteau
3.Parafoudre 30 kV, 10 kA avec accessoires de fixation sur poteau métallique
4.Traverse d'angle 30 kV, avec accessoires de fixation sur poteaux métalliques
5.Chaînes d'isolateurs d'ancrage complètes à trois éléments avec pinces d'ancrage pour conducteur nu AL-Ac 35/6mm2,
6.Raccords parallèles pour conducteur nu Al/Ac 35/6mm² , tension 30kV
7.Manchon de jonction à compression pour câble Al-Ac section 35/6mm²
8.Tiges galvanisées et filetées sur toute la longueur avec deux écrous et deux rondelles
9.Poteau métallique tubulaire de 16m, 1000daN, d’angle ou d’arrêt
10.Poteau métallique tubulaire de 16m, 1250daN, support de transformateur
11.Soulier de câble à sertir pour conducteur nu 35/6 mm2
12.Vis à bois galvanisée ou tire-fonds ; 10X120mm ; filetée à 60% pour poteaux bois
13.Transformateur triphasé 50Hz, 160kVA, 30Kv/0,4kv, réglage à vide par commutateur, couplage Dyn11, montage extérieur sur poteau métallique
14.Soulier de câble Al/Cu à sertir pour conducteur 3x35-70mm²
15.Câbles aériens pré assemblés 3X35+1X54,6+1x16mm2
16.Pinces d'ancrage pour neutre porteur pour câble pré assemblé Al, 35 à 70mm² BT 1000V
17.Pinces de suspension pour câble pré assemblé 35à 70mm² ; BT 1000V
18.Fil de fer rond galvanisé de diamètre 8mm
19.Piquet de mise à la terre, long: 1500mm, en acier cuivré, emboîtable
20.Ruban de terre galvanisé, 30x3mm
21.Pointe pour piquet de terre
22.Raccord de connexion entre ruban de terre et ruban de terre largeur 30mm et épaisseur:3mm
23.Raccord de connexion entre ruban de terre et piquet de terre
24.Raccord de contrôle et de séparation entre fil de fer et ruban de terre
Total Volume:USD 900,000.00
Country:Sierra Leone
Utility:EDSA
Total Volume:USD 5,000,000.00
Projects Background:
It was a project invested by World Bank.for supply and Installation of 11/0.4kV Distribution Network in Freetown & 11/0.4kV Distribution Substations (50, 160, 250, 400, 630kVA) & Wood Poles (9m, 10m, 11m, 12m) & Bare and Insulated All Aluminium Conductors (AAC), 50 and 120mmsq & LV Aerial Bundled Conductors (Al) c/w clamps and connectors.
Products Lists
1.11kV, 3Ph Intermediate Pole Top Structure (0 - 3°, Dwg. No. ESURP/AF/11KV/DWG/IMP)
2.11kV, 3Ph Light Angle Pole Top Structure (3° - 20°, Dwg. No. SURP/AF/11KV/DWG/LAP)
3.11kV, 3Ph Medium Angle Pole Top Structure (20°- 60°, Dwg. No. ESURP/AF/11KV/DWG/MAP)
4.11kV, 3Ph Heavy Angle Pole Top Structure (60° - 90°, Dwg. No. ESURP/AF/11KV/DWG/HAP)
5.11kV, 3Ph Terminal Pole Top Structure (Dwg. No. ESURP/AF/11KV/DWG/TP)
6.11kV, 3Ph Sectional Pole Top Structure (Dwg. No. ESURP/AF/11KV/DWG/SP)
7.11kV, 3Ph Tap (Tee - off) Pole Top Structure (Dwg. No. ESURP/AF/11KV/DWG/TOFF)
8.11kV, 3Ph Fused Tee - off Pole Top Structure (Dwg. No. ESURP/AF/11KV/DWG/FTOFF)
9.11kV Load Isolator c/w earth mat
10.Complete 11kV Stay Equipment (ref Dwg. No. ESURP/AF/11kV/DWG/STAY)Set
11.3C x 240mm2, 11kV XLPE/SWA/PVC Cu cable
12.11kV Cable Three Core Termination kits (set of 3-phase, 240mm2)
13.11kV Surge Arrester c/w mounting clamps, earthing etc. (Set of 3-phase)ABC Intermediate Pole Top Structure (0 - 3°, Dwg. No. ESURP/AF/LV/DWG/IMP)
14.ABC Large Angle Pole Top Structure (3°-20°, Dwg No. ESURP/AF/LV/DWG/LAP)
15.ABC Heavy Angle Pole Top Structure (21°-90°, Dwg. No. ESURP/AF/LV/DWG/HAP)
16.ABC Terminal Pole Top Structure (Dwg No. ESURP/AF/LV/DWG/TP)
17.ABC Tee Off Pole Top Structure (Dwg No. ESURP/AF/LV/DWG/TOFF)
18.ABC 3-Way Section Pole Top Structure (Dwg No. ESURP/AF/LV/DWG/3WAY)
19.ABC 4-Way Section Pole Top Structure (Dwg No. ESURP/AF/LV/DWG/4WAY)Tap-off connector (Piecing Screw type)
20.LV Stay Equipment Complete (ESURP/AF/LV/DWG/STAY)
21.50kVA, 11/0.4kV 3 Phase PMT c/w the accessories outlined in note 2 above
22.160kVA, 11/0.4kV 3 Phase PMT c/w the accessories outlined in note 2 above
23.250kVA, 11/0.4kV 3 Phase PMT c/w the accessories outlined in note 2 above
24.400kVA, 11/0.4kV 3 Phase GMT c/w the accessories outlined in note 2 & 630A, 6-way DP
25.630kVA, 11/0.4kV 3 Phase GMT c/w the accessories outlined in note 2 & 1000A, 8-way DP
Country:REPUBLIQUE DEMOCRATIQUE DU CONGO
Utility:Société Nationale d’Electricité
Total Volume:USD 4,000,000.00
Projects Background:
Les réseaux de distribution de la ville de Kinshasa sont sujets à beaucoup de problèmes d’exploitation.
La vétusté et la surcharge des équipements et des canalisations MT et BT ne permettent pas d’alimenter en toute fiabilité tant les charges existantes que les nouvelles.
La SNEL sur fonds propres préfinance un programme de remise en conformité de ces réseaux de distribution afin de fiabiliser la desserte en énergie électrique dans la ville de Kinshasa.
De manière brève, la charge de la ville de Kinshasa est alimentée principalement par deux systèmes de distribution primaire :
Le système 220/30/6,6 kV, composé des postes sources, également nommés postes d’injection 220/30kV de Liminga, de Lingwala et de Maluku ainsi que du poste 132/30 kV de Badiadingi qui fournissent l’énergie à la boucle 30 kV, celle-ci alimentant à son tour le réseau de distribution 6,6 kV.Ce système supporte environ 65% de la charge de la Ville.
Le système 220/20 kV qui alimente le nouveau réseau de distribution 20 kV comporte trois postes d’injection 220/20 kV (Funa,Utexco et Makala) et sera très prochainement renforcé par celui de Kimbanseke en cours de construction dans le cadre du projet EASE .
Il est prévu dans le plan directeur de la SNEL que le réseau 20 kV, actuellement en phase de développement, remplace complètement le réseau 6,6 kV.
Products Lists:
1.Ensemble d'ancrage double câble aérien BT (consoles + pinces)
2.Ensemble d'ancrage simple câble aérien BT (consoles + pinces)
3.Manchon 70 mm² Alu
4.Manchon 35 mm² Alu
5.Manchon 95 Cu/70 mm² Alu
6.Manchon 50 Cu/70 mm² Alu
7.Soulier de câble 95 mm² Cu
8.Soulier de câble 50 mm² Cu
9.Connecteur de dérivation 70/35 mm² Alu
10.Sectionneur MT tête de câble
11.Disjoncteur MT (Vacuum Interrupter)
12.Sectionneur fusible (rupto)
13.Relais de protection (IEC60870-5)
14.Disjoncteur général BT (DGBT)
15.Tableau général BT (TGBT)
16.Jeu de barres BT (5*30mm)
17.Bases fusibles
18.Réglette ou base fusible
19.Poste de sectionnement BT (PSBT) avec 5 départs
20.Coffret électricien
21.Coffret mécanicien
22."Appareil de recherche de défaut câble BT
23.Brand:TFN, made in Austria
24.Model:TFN ETDR 10A"
25.Ceinture pour monteur électricien ligne
26.Grimpette pour électricien ligne
27.Echelle (8m)
28.Multimètre
29.Pince ampéremetrique
30.Megger
31.Mesureur de résistance de terre (TES 1700)
32.Mesureur de champt tournant
Project Information:
Project Name: Palmeraie Substation Transformer Expansion Project
Owner: Electricite de Djibouti(EDD)
Awarded Date: 2022.09
What We Supplied:
ZB-KVVP2/22(FRB-CU/PVC/CTS/PVC/STA/PVC)-10×2.5
ZB-KVVP2/22(FRB-CU/PVC/CTS/PVC/STA/PVC)-14×2.5
ZB-KVVP2/22(FRB-CU/PVC/CTS/PVC/STA/PVC)-4×2.5
ZB-KVVP2/22(FRB-CU/PVC/CTS/PVC/STA/PVC)-4×4
ZB-KVVP2/22(FRB-CU/PVC/CTS/PVC/STA/PVC)-8×4
ZB-KVVP2/22(FRB-CU/PVC/CTS/PVC/STA/PVC)-4×6
ZB-KVVP2/22(FRB-CU/PVC/CTS/PVC/STA/PVC)-7×2.5
ZB-VV22(FRB-CU/PVC/PVC/STA/PVC)-4×4
ZB-VV22(FRB-CU/PVC/PVC/STA/PVC)-4×10
Project News:
The project, which is expected o be completed by the end of 2023, includes the construction of a dual fuel diesel power generation station and associated works and accessories, the expansion and development of the transmission network, the measurements, protection, control, and communication systems, and consulting services. The project includes the following main components:
Damerjog Power Generation Station: This includes the construction of Phase I of a diesel powered generation station with installed capacity of 50MW which operates on natural gas and heavy fuel oil, and all civil, mechanical and electrical works for the project’s Phases I and II.
Expansion and Development of the Transmission Network: This includes the construction of two new substations, the expansion and development of two existing substations, the installation of aerial power lines, and the laying of power cables, in addition to civil and electrical works and accessories. This includes the following components:
Nagad Substation: This includes the procurement and installation of equipment and the construction of a new 100 MVA air-insulated substation operating on 230/63/20 kV, as well as civil and electrical works, and systems for measurement, protection, control, and communications, and their accessories.
Damerjog Substation: This includes the procurement and installation of equipment and the construction of a new 100 MVA air-insulated substation operating on 230/63/20 kV, a
Project Information:
Owner: REGIE DE PRODUCTION ET DISTRIBUTION D’EAU ET D’ELECTRICITE (REGIDESO)
Project Name: POUR LA FOURNITURE DU MATERIEL D’ENTRETIEN, DE RENFORCEMENT ET D’EXTENSION DES RESEAUX SOUTERRAIN ET AERIEN MOYENNE TENSION (MT) DE BUJUMBURA ET SES ACCESSOIRES.
Delivered Date: 2022.05
Project News:
Le Directeur Général était sur terrain à Kabezi pour suivre les travaux de construction de la ligne trente (30)KV Kabezi – poste Kanyosha qui va être bientôt fonctionnelle : elle va transporter dix(10) Mw produite par la Centrale hydroélectrique de Ruzibazi et, au finish, la Regideso vise acheminer la totalité de l’énergie produite par les trois(3) groupes de cette Centrale.
Le 1er groupe de 5Mw a commencé à produire fin avril 2022 et le dernier fin Mai. Aujourd’hui, 5MW de cette centrale sont déjà injectés dans le réseau électrique du sud du pays. L’énergie restante va être injectée dans le réseau via Bujumbura.
Enfin, l’ autre souci du Directeur Général est la protection de l’environnement pendant l’abattage des arbres, la fixation des poteaux métalliques le long du corridor de la ligne 30kv. Le respect des normes environnementales reste de mise.
11/33kV distribution transformer ready to be delivered to State Grid of China
More than 2000pcs transformers are finished producing and are ready to be transported to different cities in China and for installation by State Grid and China South Grid
New Deliery to Ministry of Energy Sierra Leone
The projects was participated from Dec.2021 with our partner in Sierre Leone but for Ministry of Energy. After one year communication, we ship the finsihed products to Free Town Sierra Leone around the end of Sep.
The products include:
11kV 2000x100x75x5mm galvanised steel crossarm
5/8x9 inches bolt and nut complete with washers
5/8x4 inches bolt and nut complete with washers
5/8x15 inches bolt and nut complete with washers
1/2x6 inches bolt and nut complete with washers
1/2x15 inches bolt and nut complete with washers
Steel galvanished 700x100x100x5mm Angle Iron
0.6/11kV ABC overhead line Tension Clamp
Pole clamp and support bracket for Tension clamp of MV ABC
715x50x4mm Steel Galvanished Tie Strap
2500x100x50x4mm galvanished steel perforated C Channel
0.415/1kV ABC overhead line Tension Clamp
Pole clamp and support bracket for Tension clamp of 1kV ABC(9m)
Pole clamp and support bracket for Tension clamp of 1kV ABC(12m)
110x118x4mm steel D-iron complete (with insulator)
Anchoring clamp for MV ABC Cable
Pole clamp and support bracket for Anchoring clamp of MV ABC
Suspension clamp for MV ABC Cable
Pole clamp and support bracket for Suspension clamp of MV ABC
Project Information:
Project Name: Subestação Eléctrica de Castelo Branco 220/150/60kV
Owner: MINISTRY OF ENERGY AND WATER (MINEA)
EPC Contractor: Electro Force
Delivery Date: 2022.09
What We Supplied:
CABLE LXHIOV 1X120/16 18/30(36)kV
CABLE ASTER LA56
CABLE PARTRIDGE LA160
CABO COBRE GENLIS HO7V-R 450/750V 1X35 AM-VD
CABO XV 0,6/1KV 1X70
CABO XV 0,6/1KV 1X150
CABO XV 0,6/1KV 1X240
Project News:
Subestação eléctrica constituída por 2 Painéis blindados isolados a gás (GIS) de 400kV
Trabalhos Executados:
Montagem de toda Rede de Terras aérea;
Montagem de todas as estruturas metálica;
Montagem de todos os equipamentos AT, MT e BT;
Passagem e ligação de todos os cabos AT, MT e BT (potencia e comando);
Montagem e ligação da iluminação interior e exterior da Subestação;
Montagem da Instalação eléctrica geral nas Salas técnicas.
Project Information:
Project Name: Design, Supply, Construction and Commissioning of Conductor Replacing(Turnkey) (132kV Mann-Magway Transmission Line, 61.3km)
Owner: Department of Power Transmission and System Control
Awarded Date: 2022.09
What We Supplied:
Formed Annealed Aluminium Conductors Carbon Fiber Composite Core Supported ASTM-JLRX1/F1B-250/28
Applicable Standards:
ASTM B 609
ASTM B 857
ASTM B 987
Project News:
The DPTSC (Department of Power Transmission and System Control) has allocated funds to finance the cost of turnkey system for Material Supply, Conductor Replacing and Commissioning Work of 132kV Mann-Magway Transmission Line of Myanmar Power System Grid.
Material Supply & Conductor Replacing Work (Transmission Line): 132kV, Mann-Magway Transmission Line LOT(1), 61.3 km
Existing Conductor: ACSR 397.5MCM (IBIS)
New Replacing Conductor: ACCC 491MCM (GDANSK)
INSULATED STRAIN COPPER EARTHING WIRE, CU/XLPE/PVC, LV 600/1000V & MV 12KV CABLES FOR PROCUREMENT OF MV & LV MATERIALS AND ACCESSORIES FOR POWER DISTRIBUTION NE
3200pcs of Disconnection Switches delivery to Indonesia
FAT from Uganda REA for power cable accessories and so on
First delivery to East Africa after CNY holiday with CKD solution. Good beginning of 2019
Happy Chinese New Year 2019!!
We are on the way!!
Cargo arrive MOEE warehouse for C1-G6 projects, our engineers go and help MOEE to check the items and finish the final inpection. We will keep offering support to MOEE in the future.
Our Guests from MOEE to inpsect the contact of C1-G6, the inspection products include Power Cable, Switch Gear, Power fitting, Surge Arrest and so on.
The Whole team stay in China around one week include a consulator from Korea
Fast power solution
Good technical support
Stable order supply
Responsible merchant contract sprit
Zhejiang SeaTrust Power Co., Ltd has strict quality control system based on ISO9001 standard with high efficient producing machine such as: FORGING COMPRESSION WORKSHIP, HYDRAULIC COMPRESSION MACHINE, HYDRAULIC COMPRESSION MACHINE, DIE PROCESSING CENTER and so on.
The new producing base is more than 30,000 m2, we have more than 500 workers include 22 engineers for new items design and development. SeaTrust also have very professional overseas team to give good support in the site view and customized products supply.